Material selection starts with the process

Stainless steel grade cannot be selected from the product name alone. Concentration, impurities, chloride level, pH, temperature, aeration, cleaning chemicals, residence time and the possibility of deposits all affect corrosion behaviour. The fabrication route, weld condition and required surface finish must also be considered.

A practical comparison

GradeTypical strengthsPoints to review
AISI 304General-purpose food, water and mild chemical dutiesLimited resistance where chlorides or aggressive cleaning media are present
AISI 316Improved pitting resistance through molybdenum additionStill requires a duty-specific corrosion review
AISI 316LLow-carbon grade preferred for many welded fabricationsWelding quality, pickling and passivation remain important

Chlorides, temperature and deposits

Pitting and crevice corrosion risk generally rises with chloride concentration, temperature and stagnant conditions. Deposits, gaskets and poorly drained details can create local environments that are more aggressive than the bulk fluid. A material that performs in a clean laboratory sample may behave differently in a production tank with heat, oxygen gradients and cleaning cycles.

Welding and surface condition

The selected grade is only one part of corrosion performance. Weld procedures, heat tint removal, pickling, passivation, surface roughness and fabrication cleanliness influence the finished equipment. Carbon-steel contamination during grinding or handling should be prevented, particularly for hygienic and high-purity duties.

Information required before selection

Provide the full formulation and likely contaminants, minimum and maximum operating temperatures, cleaning chemicals and concentrations, pressure or vacuum, expected service life, product-contact finish and any applicable customer or regulatory specification. Where corrosion risk is uncertain, coupon testing or specialist materials advice may be appropriate.

Engineering note: This article provides general technical guidance. It is not a final design, code calculation, operating instruction or certification. Materials and equipment must be verified for the confirmed process, project standard and site conditions.

Continue exploring

All technical articlesProduct groupsDiscuss a project